Einz Engineering & Construction (S) Pte. Ltd was contracted by Hitachi Plant Construction, Ltd. Singapore for the complete removal and reinstatement of the Sea Water Intake Pump 30. This critical project was executed at the YTL Power Seraya facility on Jurong Island.
The project involved a comprehensive, multi-stage operation to dismantle, remove, and subsequently reinstall the entire pump assembly. Our scope began with all site preparation (SIC) and the full mobilization of specialized tools and skilled manpower to the work location.
The dismantling phase required the systematic removal of the motor, its accessories, the access platform, and associated ladders. This was followed by the careful dismantling and removal of the motor stool, delivery bend, and top shaft. Our team then proceeded to safely extract the lower pump components, including the bottom parts, column pipe, and impeller assembly.
Reinstatement was meticulously executed in reverse order, starting with the installation of the new bottom shaft, impeller lock nut, and column pipe. The bottom pump parts, top shaft, and delivery bend were then reassembled. Finally, the motor stool, motor, and all accessories were reinstalled, culminating in precision alignment works to ensure the pump's operational integrity.
The project concluded with the complete and safe demobilization of all personnel and equipment from the YTL Power Sereya site.