Singapore Chemical Manufacturing Plant Project

Client: JEL Maintenance Pte Ltd
End Owner: Baker Hughes
Location: Jurong Island, Singapore

EINZ Engineering & Construction (S) Pte. Ltd was contracted by JEL Maintenance Pte Ltd to perform critical equipment installation for the Baker Hughes Singapore Chemical Manufacturing Plant Project on Jurong Island. The project, which spanned approximately eight months, involved providing a specialized team, precision tools, and full project support for the installation of major plant components.

EINZ team planning equipment installation at Baker Hughes site
Large reactor and vessel installation with scaffolding

Core Scope: Mechanical & Equipment Installation

Our primary role was to provide the skilled manpower and equipment necessary for the complete mechanical installation of key project assets.

  • Erection of steel tanks, reactors, vessels, and heat exchangers.
  • Installation of pumps, agitators, and other complex packaged equipment.
  • Performed all alignment, inspection, formwork, and grouting for the new equipment.
EINZ engineer inspecting pump flange for precision alignment

Foundation, Alignment, and Grouting

The project required meticulous preparation of equipment foundations to ensure precise and stable installation.

  • Executed foundation preparation, including concrete chipping, padding, and curing.
  • Conducted precision alignment and final inspection for all installed components.
  • Completed all formwork and grouting to secure the equipment and ensure long-term operational integrity.
EINZ certified welder with newly fabricated pipe spool

Skilled Manpower & Project Support

EINZ supplied a full-service team to execute the works, supported by all necessary tooling and lifting equipment.

  • Provided a dedicated team of supervisors, foremen, millwrights, fitters, certified welders, riggers, and operators.
  • Supplied all required tools, consumables, and certified lifting gears for safe and efficient operations.
  • Assisted the client in the preparation of critical documentation, such as lifting plans and safe work procedures.
Dedicated EINZ project team posing at the Baker Hughes site

Our Dedicated Project Team

At the heart of every successful project is a dedicated and skilled team. For the Baker Hughes Singapore Chemical Manufacturing Plant, our project team delivered exceptional commitment and expertise, ensuring every phase of the installation met the highest standards of safety and quality. Their collaborative effort and technical proficiency were instrumental in overcoming challenges and achieving project milestones efficiently.

We pride ourselves on fostering a culture of teamwork, continuous learning, and adherence to rigorous industry standards. Each member contributed significantly to the seamless execution of complex mechanical installations and foundation works.

Need Reliable Mechanical Engineering Solutions?

Let's discuss your next project. We are committed to delivering on time and on budget.

Contact Us Today